Request a Quote

Site
Record

Ductwork, chiller plant, VRF systems and controls, photographed on active Dubai projects by installation, maintenance and commissioning across Dubai, representative of the scope of work we undertake.

Marjan Aldhyd engineering team on a rooftop plant deck alongside packaged HVAC units

5.1 Gallery

Ductwork, plant
and controls

16 project photos shown

Insulated ductwork supported on galvanised steel frames beside cable tray routes
PI ductwork & support steel
Insulated supply duct connected to an air handling unit with damper access
AHU supply duct connection
External pre-insulated duct elbow terminating at a weather louvre on a building facade
External duct & louvre
Internal duct riser with return air grilles in a fitted-out technical room
Internal riser & grilles
Technicians installing an insulated duct run above a commercial ceiling void
PI duct riser & plant connection
Insulated air distribution ductwork routed across a steel support platform on an industrial site in Dubai
Air distribution network
GI ductwork sections being fabricated and assembled in the workshop
PI duct fabrication on site
Air-cooled chiller compressor removed for overhaul on a rooftop plant deck
Chiller compressor overhaul
Screw compressor rotors exposed during workshop strip-down and inspection
Screw compressor inspection
Chilled water pipework and header connections prepared for reassembly during plant maintenance
Chilled water header works
Semi-hermetic chiller compressors with refrigerant piping being serviced in a plant room
Compressor bank servicing
Chiller controller showing running status, condenser and evaporator temperatures
Chiller controls & performance check
Wall mounted air conditioning controller displaying room temperature and fan settings after commissioning
Room controller commissioning
Control panel wiring with high pressure, low pressure and oil pressure gauges in a chiller plant room
Plant control panel
VRF outdoor condensing units opened for electrical and refrigerant commissioning
VRF outdoor unit commissioning
Technician preparing a new indoor unit inside a protected and sheeted interior fit-out area
Indoor unit installation

5.2 Clients

Buildings
we look after

Two of these properties run on an annual maintenance contract. The others brought us in on chiller work.

Annual maintenance 02 sites

  • Oceanic Khorfakkan Resort & Spa
  • BMA International

Chiller repair & overhaul 06 sites

  • Queen Elizabeth 2 (QE2)
  • FIVE Hotel, Dubai Marina
  • Tadawi Hospital
  • Airo Star
  • Katrina General Trading
  • Etisalat Academy

5.2

For tender & pre-qualification

Detailed project references, scope summaries, the trade licence copy and the full company profile are issued on request for vendor registration and pre-qualification submissions.

Request project references

Want work like
this on your site?

Send the location and the scope you need priced. We come and assess it.